OUR PROCESS
Natural Sheffield Clay is mined on our property from as seen at one of the open clay pits. The Sheffield Clay deposit is located in Sheffield, Massachusetts, on U.S. Route 7 in the Southwest corner of Berkshire County.
SOLID STATE RELAYS MAKE ELEMENTS LAST LONGER!
Solid State Relays are quiet and result in longer element life because the switching time is so fast the elements don’t heat and cool as much the way the will with regular mechanical contactors. The whole system includes heat sinks, special fast acting fuses, cooling fan and extra safety relays.
It is possible to get this option with a High Limit Control as well and with our without Back Up Contactors. Note that the photograph shows a NEMA 1 panel with 6 SSRs, the safety contactors and the High Limit Control with its own set of back up contactors.
Panels with 6 circuits need to use the NEMA 1 panel (because fo the size required to house all the components) even if the panel is not 480 volts.
The SSR option is available on the Easy-Fire, Easy-Fire XT, eQuad-Pro, Jupiter, JH Series, eFL Series, DaVinci, Hercules and Easy-Load kilns.
You’re viewing 1-0 of 0 products
Natural Sheffield Clay is mined on our property from as seen at one of the open clay pits. The Sheffield Clay deposit is located in Sheffield, Massachusetts, on U.S. Route 7 in the Southwest corner of Berkshire County.